Archive the microvm framework adoption plan #47

Merged
vnprc merged 1 commit from agent/microvm-withdrawal into master 2026-09-08 13:24:46 +01:00
Member

Two documents move from the active dev-plans/ and review-prompts/ directories to archive/, beside the older microvm plans already there: the framework adoption plan and its review prompt. Nothing else changes and reports/ is untouched. Nothing builds from this repo, so nothing can break; if the move is wrong, move them back.

Refs allod/strategy#46. Independent of the merge order of the code PRs.

Two documents move from the active `dev-plans/` and `review-prompts/` directories to `archive/`, beside the older microvm plans already there: the framework adoption plan and its review prompt. Nothing else changes and `reports/` is untouched. Nothing builds from this repo, so nothing can break; if the move is wrong, move them back. Refs allod/strategy#46. Independent of the merge order of the code PRs.
The runtime is withdrawn from the framework, so the plan and prompt join
the older microvm plans in archive/.

Refs allod/strategy#46
vnprc approved these changes 2026-09-08 13:24:33 +01:00
vnprc merged commit c08e351210 into master 2026-09-08 13:24:46 +01:00
vnprc deleted branch agent/microvm-withdrawal 2026-09-08 13:24:46 +01:00
Sign in to join this conversation.
No description provided.